Pipework

Hydraulic System Retrofit for Railway Tunnel Maintenance Platform

Hydraulic System Retrofit for Railway Tunnel Maintenance Platform AFP has completed a hydraulic system retrofit for a railway tunnel maintenance platform, delivering a tailored solution to meet the operational demands of the rail sector. The custom-built system incorporates a series of heavy-duty cylinders, robust valve manifolds, and high-pressure tubing and hoses. Both manual and remote […]

Hydraulic System Retrofit for Railway Tunnel Maintenance Platform Read More »

Completion of Amrun Stacker & Reclaimer Pipeworks

We are proud to announce the successful completion of the Stacker & Reclaimer lubrication/water/hydraulic installation and pre-commissioning works on the Amrun Project. Well done to everyone involved! Visit https://www.aussiefluidpower.com.au/services/tube-and-pipe-installations/ to read more about our previous piping projects.

Completion of Amrun Stacker & Reclaimer Pipeworks Read More »

AFP completes Queensland lube oil flushing projects

AFP successfully completes another Lube Oil Flushing project, this time for the train compressors at the Eurombah Creek Gas Processing Facility. The project forms part of the Australia Pacific LNG (APLNG) Phase 1 upstream works for construction within the Coal Seam Gas Development within the Surat Basin.

AFP completes Queensland lube oil flushing projects Read More »

AG Mill lubrication piping installation

AFP successfully completed the lubrication piping installation, testing and flushing for Mill 3 on the Sino Iron Project at Cape Preston. The Project is a world class, large-scale magnetite iron ore project. It has an anticipated production life of 25 years with sufficient capacity to produce 84 MTPA of feed to the concentrator, and designed

AG Mill lubrication piping installation Read More »

AFP completes hydraulic works for Rio’s Pilbara expansion operations

With a strong background in hydraulic systems, AFP was engaged to provide a full turnkey solution for lubrication and hydraulic pipework as part of the Yandi Sustaining Project. The project is focussed on upgrading the existing Rio Tinto Yandicoogina Mine located in the Central Pilbara region of Western Australia. AFP’s scope of works consist of

AFP completes hydraulic works for Rio’s Pilbara expansion operations Read More »

New system for non-welded tube connections

Introducing the latest addition to AFP’s hire equipment fleet: the WALFORMplus™ Cold reshaping machine. The machine creates positive-locking tube connections that guarantee complete reliability, even under high static and dynamic load. Prefabrication, elimination of hot-works and a streamlined assembly process all help reduce the risk of improper installation. The WALFORMplus™ system is suitable for steel and stainless steel

New system for non-welded tube connections Read More »