Hydraulic Flushing

1,070L/min flushing rig added to hire fleet

1,070L/min flushing rig added to hire fleet

AFP currently owns and operates one of the most extensive fleet of flushing and hydrostatic testing equipment in Australia. The new addition provides variable flow rates up to 1,070L/min. Two double vane pumps, an enormous 1,100L reservoir and inline filters can efficiently condition oil in bulk volumes. All AFP flushing rigs and testing & flushing …

1,070L/min flushing rig added to hire fleet Read More »

AG Mill lubrication piping installation

AG Mill lubrication piping installation

AFP successfully completed the lubrication piping installation, testing and flushing for Mill 3 on the Sino Iron Project at Cape Preston. The Project is a world class, large-scale magnetite iron ore project. It has an anticipated production life of 25 years with sufficient capacity to produce 84 MTPA of feed to the concentrator, and designed …

AG Mill lubrication piping installation Read More »

AFP completes hydraulic works for Rio’s Pilbara expansion operations

AFP completes hydraulic works for Rio’s Pilbara expansion operations

With a strong background in hydraulic systems, AFP was engaged to provide a full turnkey solution for lubrication and hydraulic pipework as part of the Yandi Sustaining Project. The project is focussed on upgrading the existing Rio Tinto Yandicoogina Mine located in the Central Pilbara region of Western Australia. AFP’s scope of works consist of …

AFP completes hydraulic works for Rio’s Pilbara expansion operations Read More »

AFP Completes Hydraulic Flushing and Inspection for Second Rio Car Dumper

AFP Completes Hydraulic Flushing and Inspection for Second Rio Car Dumper

This completes AFP’s final stage on the Cape Lambert B project. The project involved the design, supply, installation and commissioning of hydraulic and lubrication lines. Careful planning of key activities including fast mobilisation of personnel and equipment, was fundamental to the success of this project and saw the work completed ahead of schedule. Stringent safety and environmental …

AFP Completes Hydraulic Flushing and Inspection for Second Rio Car Dumper Read More »

Works Commence for Final Cape Lambert Car Dumper

Works Commence for Final Cape Lambert Car Dumper

Aussie Fluid Power begins hydraulic works for the final car dumper at Cape Lambert after completing the first one ahead of schedule.  To date, Aussie Fluid Power has installed, tested and flushed about 2 km of lubrication & hydraulic lines. The works have been completed incident free. The works are part of the Monadelphous Cape Lambert …