Description: Our vital work on the subsea screeder allowed flat rock foundation of the jetty to be laid before the commencement of caisson placement.
Description: The Cavotec Mooring System uses hydraulics and giant suction pads to secure boats, superseding the traditional rope method. All hydraulics for the jeti were supplied and installed by AFP
Description: Engineer, design and build a ballast control system able to control a 3,500 tonne concrete caisson.
Description: A flushing skid HPU designed and built using water hydraulics technology that uses ZERO oil during operation.
Description: AFP was commissioned for a full refurbishment of a mineral sands dredge. The project was completed on time and budget, presenting significant savings in resources compared to acquiring a brand new dredge.